ADDED Requirements
Requirement: Protected trunk and short-lived working branches
The repository workflow MUST require all feature development to happen on short-lived branches, and trunk branches MUST be integrated through reviewed pull requests.
Scenario: Developer starts new work item
- WHEN a developer starts implementation for a new task
- THEN the developer MUST create and use a
feature/* or fix/* branch instead of committing directly to trunk
Scenario: Code is merged to trunk
- WHEN a branch is ready for integration
- THEN the change MUST be merged through a pull request with review instead of direct push to trunk
Requirement: Standard daily sync flow
The team sync process MUST use a consistent sequence (status check, fetch, then branch update) to reduce avoidable merge conflicts.
Scenario: Branch is up to date before coding
- WHEN a developer begins or resumes work
- THEN the developer MUST verify working tree status and synchronize the branch using the documented standard sequence
Scenario: Shared branch update occurs
- WHEN remote commits are detected on the tracked base branch
- THEN the developer MUST update local branch history using the defined sync strategy before continuing new commits
Requirement: Consistent commit and integration checkpoints
The workflow MUST define minimum checkpoints for commit quality and pull request readiness before integration.
Scenario: Developer prepares to push
- WHEN local commits are ready to publish
- THEN commit messages and change grouping MUST follow the repository contribution policy
Scenario: Pull request is opened
- WHEN a pull request is submitted for review
- THEN it MUST include required context (scope, impact, validation evidence) defined by the collaboration policy